Energy Saving Solutions

GSE-M provides energy-efficient industrial solutions designed to improve thermal performance, optimise energy utilisation, and reduce unnecessary heat loss. Our solutions include energy-efficient drying ovens, heat recovery systems, and specialised process equipment configured to support reliable production and long-term operating efficiency.

Electric Heater Drying Oven
Project Location:

Malaysia

Year Manufacturing:

2025

Purpose:
Drying, Curing, Heat Treatment
Special Feature:
Include a heat recovery system which able to recover >25 kWh of energy @ 290°C
Gas Heater Drying Oven
Project Location:

Malaysia

Year Manufacturing:

2025

Purpose:
Drying, Curing, Heat Treatment
Special Feature:
Built-in safety: Low Explosive Limit (LEL) control, gas detection, triple exhaust & pressure relief
Heat Treatment Annealing Furnace
Project Location:

Malaysia

Year Manufacturing:

2026

Purpose:
Heat treatment for annealing, aging and tempering of metal components.
Special Feature:
Indirect firing with bayonet heat exchanger, up to 50% energy recovery, 600°C ±1°C temperature control, automatic loading & unloading, and quick air quench capability.
Hot Air Heat Recovery System
Project Location:

Thailand

Year Manufacturing:

2018-2022

Purpose:
To pre-heat air intake with the heat source from hot air exhaust line.
Special Feature:
Green technology – Recovering heat energy
Batch Oven for Aircraft Heat Exchanger
Project Location:

Malaysia

Year Manufacturing:

2013

Purpose:
Cure the aluminum coating on the heat exchanger
Special Feature:
Wider space for bigger and longer heat exchanger
Powder Coating Batch System
Project Location:

Malaysia

Year Manufacturing:

2018

Purpose:
Full Powder Coating Line (Dipping/ Spray Pretreatment, Powder Booth, Curing Oven & Dust Collector) for Metal Panel & Metal Frame Structure.
Special Feature:
Designed for High Standard Coating –Especially White Glossy Finish. Oven comply AMS2750 standard
Degreasing Oven (Near Infrared (NIR) Heating System)
Project Location:

Thailand

Year Manufacturing:

2018

Purpose:
To remove oil / degrease from heat exchanger
Special Feature:
Complete with NIR heating system with heat recovery system
Robot Painting Line for Headlamp with UV Curing
Project Location:

Malaysia

Year Manufacturing:

2019

Purpose:
Wet coating & UV curing process for car lamp
Special Feature:
Energy saving –Spray booth conditioned air recycling system

Send Us Your Enquiry Now

Leave your details and our sales team will contact you as soon as possible.

Contact Us

Reach out to us for any inquiry